Searing Industries contracted RCI to design and build a steel tube manufacturing facility consisting of 200,000 square feet of concrete tilt up walls and structural steel along with a supplementary 9,000 square feet of wood framed office space. Numerous cranes ranging from 5-ton to 30-ton full span machines are housed in almost each bay of the interior structural steel and are responsible for moving raw materials and finished products for transit. RCI was tasked with the unique challenge of providing a temperature controlled facility that met current building codes along with the desire of the owner to control initial costs and maintenance costs of the system. RCI worked closely with all members of Searing Industries to successfully complete this project. RCI assembled a design team along with engineers and material suppliers to bring this facility to fruition on time and within the desired scope.
Reference Contact:
Lee Searing, Owner
8901 Arrow Route
Rancho Cucamonga, CA 91730
(909) 948-3030
lee@searingindustries.com
101 Lexington Avenue, Suite 2
Cheyenne, WY 82007
Office: (307) 635-6166
Fax: (307) 635-6213
office@rciwyo.com
Copyright Richardson Construction, Inc
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.